Madrid–Extremadura High-Speed Rail: New Study Returns to 2008 Alignment (xataka.com)
- Ministry of Transport approves new study for Madrid–Extremadura AVE, reverting to the 2008 plan with branch lines at Pantoja.
- Talayuela–Cáceres section nearly complete; Cáceres–Badajoz high-speed link operational since December 2025 (50 min).
- Toledo routing dispute persists: viaduct over Tagus River opposed locally; alternative alignment still under study.
"Spain's Ministry of Transport has approved a new study for the Madrid–Extremadura high-speed rail line, proposing two branches from the Andalusian corridor at Pantoja, returning to the plan discarded in 2008 and abandoned in 2017. The Toledo section remains contentious due to a required viaduct over the Tagus River, facing local opposition. The Talayuela–Cáceres section is nearly complete, and since December 2025, a high-speed link connects Cáceres and Badajoz in 50 minutes. However, the full connection to Madrid has been delayed for 25 years, with travel times still comparable to 1970."
no comments yet.